So far I have torn down the existing drywall and insulation from the walls. I have also started ripping out the electrical runs and outlets. I am currently working on reinforcing the external walls to provide maximum soundproofing. This will involve a layer of 1/2" rigid foam, 5/8" drywall, Green Glue, 5/8" drywall and fiberglass insulation to fill the rest of the space. This will all be placed against the outside wall in between the studs. The illustration on the right shows how it will be laid out. It is from a top down view and not to scale but gives a good visual of the whole outer leaf of the wall. The rigid pink foam is to cover the nails protruding through the sheathing so the drywall will have a flat surface to go against. This is the only step I have completed so far. Once I start hanging drywall I will post an update with some pictures.Monday, April 27, 2009
Studio Plans
So far I have torn down the existing drywall and insulation from the walls. I have also started ripping out the electrical runs and outlets. I am currently working on reinforcing the external walls to provide maximum soundproofing. This will involve a layer of 1/2" rigid foam, 5/8" drywall, Green Glue, 5/8" drywall and fiberglass insulation to fill the rest of the space. This will all be placed against the outside wall in between the studs. The illustration on the right shows how it will be laid out. It is from a top down view and not to scale but gives a good visual of the whole outer leaf of the wall. The rigid pink foam is to cover the nails protruding through the sheathing so the drywall will have a flat surface to go against. This is the only step I have completed so far. Once I start hanging drywall I will post an update with some pictures.Posted by Rob at 8:00 AM 0 comments
Labels: STUDIO
Friday, April 24, 2009
openSuse 11.1 on Virtual PC 2K7: noreplace–paravirt i8042.noloop clock=pit explained
Seeing how I have some serious free time at work and have been studying for the Linux+ exam, I decided I needed a Linux machine at work. I am using openSUSE 11.1 with VPC 2K7. Now there are plenty of howtos out there so I won't post another one. I am going to explain something that seems to be a common thread throughout almost all the distros and VM software.
Posted by Rob at 10:26 AM 1 comments
Labels: LINUX
Thursday, April 23, 2009
Linux+: Week 1
I started studying for my Linux+ exam this week. As part of my studying I setup a dual boot laptop with Fedora 10 w/ GNOME and openSUSE 11.1 w/ KDE. The laptop is just an old HP with a Pentium M 1.6GHz and 512MB of RAM. Both distros installed fine and I am dual booting using GRUB with no problems. My only hang up was that openSUSE kept running the processor at ultra low voltage. All I did was change the power settings for the processor to disable dynamic frequency scaling. I would suspect the problem to be with the laptop and not the OS.
Posted by Rob at 8:28 AM 2 comments
Labels: CERTIFICATIONS, LINUX
Wednesday, April 22, 2009
One Year Later...
Thought I would give this whole blog thing another go around. So here is the depressingly short update on the past year.
Thursday, March 20, 2008
Breeding Update: End of Season
It looks like I will not be having any viable young this year. My female dropped the rest of her litter last Saturday and they were all stillborns with one last slug. She is now in shed and has taken a meal, so at least she is recovering nicely. I have tried to find solace in the fact that she is in good health and should be ready to try again this year. But cleaning up dead babies is just no fun.
Posted by Rob at 1:21 AM 1 comments
Labels: SNAKES
Wednesday, March 5, 2008
Robophidians
Since my real snakes are doing less than stellar I thought I would post this sweet video of robotic snakes. They were built by the folks at the Carnegie Mellon University Robotics Institute.
Posted by Rob at 10:40 PM 0 comments
Labels: TECHNOLOGY
Saturday, March 1, 2008
Breeding Update
My albino female had her pre-birth waxy stool yesterday and with it came 2 unfertilized eggs, 5 still born babies and some regular stool. It is not uncommon for a female to deliver premature babies with a defecation within the last month but to have her drop such a mess right around the time she is supposed to deliver makes me less than optimistic. She has thinned out a lot after all this but is still acting like a pre-parturition female as opposed to one who just delivered. I am going to give her a week and she how she behaves but this may be the end of my season this year. I am disappointed and a little mad. This season has been rife with problems and set backs that do not seem to trace back to any problems in my husbandry. Just lots of bad luck.
In other snake news, my male Fredward is still not doing very well. He developed a mystery sickness around the holidays and has not responded to any form of treatment. I helped him shed for the third time now. He cannot control his head movement enough to shed properly and he has to be assisted. I think he may be at the end of the line. I will try to feed him one last time this week and if he still cannot swallow then he will have to be put down.
Funny how easily we forget that we are working with wild animals and abiding by nature's laws. I thought I would have produced ten times my current collection this year and instead it looks like I am losing half of it.
Posted by Rob at 10:09 PM 1 comments
Labels: SNAKES
